SCII ship follow El-Reedy agency has docking our 9000 Ton floating dock to make the following works:
- Sand swip above water line & under water line
- Sand plsting and painting the hull
- Replace the required steel after thickness measurements
- Manufacture the duct for cement line
- Disassembly – repair – assembly for major valves