(ZAMZAM) tug boat follow Alexandria port authority has docking to 9000 Ton floating dock to perform the following works:
- Sand blasting and painting for ship hull
- Clean, paint the chain locker and chains
- Replace 5 Ton marine steel after thickness measurement of the hull
- Disassembly – Assembly the rudders after the required clearance measurements